Latest Notices

FireSmart Project FS-807 (RFP)

REQUEST FOR PROPOSALS (RFP)
FireSmart Project FS-807

The Village of Carmacks invites qualified contractors to submit proposals for performing FireSmart fuel modification treatment to reduce wildfire hazards in designated high-risk areas.

Key Details:

  • RFP Issue Date: October 15, 2025
  • RFP Closing Date: October 28, 2025, at 3:00 PM Yukon Standard Time
  • Project Duration: Upon contract award, all work must be completed by March 10, 2026.

Contact Information:

Parminder Singh
Chief Administrative Officer
Phone: 867-863-6271
Email: CAO@carmacks.ca

Submission Requirements:

Proposals may be submitted:

  1. By Hand or Courier:
    CAO Office, Village of Carmacks
    143 River Drive, PO Box 113, Carmacks, YT Y0B 1C0
    Clearly mark: FireSmart Project FS-807 
  2. By Email:
    Email to: CAO@carmacks.ca (maximum file size: 15 MB)

Scope of Work:

The project includes fuel modification and vegetation treatment as per the FireSmart Treatment Prescription (Appendix A). Tasks involve spacing, pruning, burning woody debris in compliance with safety regulations, and daily waste disposal.

Evaluation Criteria:

Proposals will be evaluated based on:

  • Company profile and experience (25%)
  • Personnel qualifications (20%)
  • Equipment and safety protocols (20%)
  • Lump sum contract price (25%)
  • Optional interview (10%)

Additional Information:

This RFP does not obligate the Village of Carmacks to award a contract. For detailed project requirements and submission instructions, refer to the full RFP document available upon request.

We encourage interested contractors to inquire about the project before the inquiry deadline on October 28, 2025, at 3:00 PM.

We look forward to your submissions!

Public Notice: Landfill Construction – Weigh Scale Project

Effective immediately, the Village Solid Waste Facility (landfill) is an active construction site for the weigh scale project. For safety and traffic management:

  • The Free Store is temporarily not accessible. Please do not drop off donations at this time. Hold items until access is restored.

  • Expect lane shifts, equipment movement, and short delays at the site entrance.

  • Follow the attendant’s directions and all posted signs. Reduced speeds and temporary traffic controls are in effect.

  • Keep children and pets inside vehicles at all times. Give heavy equipment the right-of-way.

Regular landfill hours remain in effect unless otherwise posted. We’ll provide an update once access to the Free Store is restored.

Public Notice – Temporary Road Closure on Mt. Nansen Road

Please be advised that Mt. Nansen Road will be periodically closed to traffic for scheduled rehabilitation work.

  • Dates: September 15 – October 15, 2025

  • Hours of Closure: 7:00 a.m. – 2:00 p.m. daily (morning hours only)

  • Location: At kilometres 20–22, 30–36, and 55

  • Reason: Culvert rehabilitation, replacement, and road height increases

During these hours, no traffic will be permitted through the work area. A “Road Closed” sign will be placed at KM 0 each day the closure is in effect. The road will reopen outside of these stated hours unless otherwise posted.

We ask for your patience and cooperation while this important work is completed.

For more information or concerns, please contact:
Project Manager – 780-953-0969